Shahram Azarsa
Planning and
Project Control
1315 Eastern
Parkway, Brooklyn, NY, 11233
Azarsa.shahram@gmail.com
832 805 4355
Shahram
Azarsa
Scheduling,
Planning and Project Cost Control Manager
1315 Eastern
Parkway, Brooklyn, NY, 11233
azarsa.shahram@gmail.com
832 805 4355
Core
skills
ü Team leadership,
coaching & team development for scheduling department
ü Training and
teaching experience for scheduling team
ü Delay analysis/ Extension of Time analysis and forensic scheduling
techniques
ü Master skills and
extensive experience in using primavera p6
ü Construction
Scheduling Management
ü CPM and earned
value analysis
ü Engineering and
construction progress management
ü Planning based on
piping 3D model review stage
ü Develop EPC
resource loaded schedule
ü Oil & gas
Refinery, Petrochemical, LNG, Tunnel, Mining, Building, Pipeline and
Transition projects
ü Manufacturing
scheduling
|
|
|
|
|
|
|
|
Professional
summary
16 years experience in
project scheduling and control including 6 years as manager of multi billon
projects in all phases of engineering, procurement, construction,
pre-commissioning and commissioning with strong knowledge of project
planning/scheduling, CPM analysis, float path analysis, Earned value
analysis, cost control & forecast, progress performance and productivity
analysis.
My career has been
developed from a field scheduler to planning manager and on a variety of
project types in both client and contractor sides including refinery, LNG,
petrochemical, pipeline and mining project.
Well versed in the use
of schedule and software such as Primavera P6, Ms Project, Sap, Expedition,
Word, Excel, Power Point, Access, Visio, and familiar with Acumen fuse and
Pert master risk analysis, constructware and PSR.
Summary
of expertise:
ü Excel at developing
resource loaded time schedule and preparing the s-curve
ü Prepare EPC detail
schedule through level 1 to level 5 with the basis of schedule
ü Working experience
in home office and field assignment
ü Identify potential
risk factor & risk analyze and their effect on the schedule
ü Good understanding
of engineering documents in each discipline in EPC projects
ü Extensive knowledge
of procurement phase and familiar with vendor drawing
ü Familiar with
construction job phases and commissioning/start-up sequence.
ü Establish &
maintain the project WBS based on contract / scope of work
ü Have in depth
experience resource loading schedules with man-hours and quantities at
various levels of complexity
ü Ability to lead
detail planning sessions with all levels of the organization
ü Ability to use
(PDFs, P&IDs, plot plan, layout, construction constructability &
execution plan, ISO drawing, equipment list, cable schedule, one line
diagram, instrument index foundation drawing, excavation drawing, RAS, ROS,
eng. WBS, bases of estimate and SOW) to develop construction schedule
ü Acts as a key
contributor in a complex and critical environment
ü Lead planning &
scheduling teams or projects; shares expertise
ü Familiar with manufacturing planning and vendor
schedules of some equipment like as boiler,
potable water, polishing water, desalination plant, vessel, drum, air cooler,
heat exchanger, flare stack, storage field fabricated tanks, electrical
panels
ü
Education: B.S., Industrial
Engineering, Azad University - Karaj, Iran, Completed – March 2000
Teaching
Experience
ü
2
courses of MSP for Power Ministry Training Center
ü
1
course of MSP & Primavera for Sungun team and also for Project
Contractors as In-house trainer
ü
1
course of MSP for SPGC (as instructor of Iranian branch of Total Co.)
ü
1
course of Primavera P6 for Nargun Management Co.
ü
Primavera
P6 courses for project control team in OIEC Company as In-house trainer
Representative
projects
MTA, NYC,
Scheduling Delay Analysis level 5 June 2016 up to
present
New York City
ü
Analyzed
the contactors Extension of time (EOT) and additional work orders (AWO)
ü
Analyzed
the concurrent delays, critical delays and addressing the schedule claims
based on them
ü
Reviewed
the contractors schedule and updates
ü
Checked
the needs of GOs, piggy back and flag signal in the schedules
ü
Prepared
a instruction in order to implement the scope changes into the project
schedule
KBR, HOUSTON TX,
Lead Scheduler, March 2014 to March 2016 (24 Months)
Project: Koch Enid Urea
Petrochemical Plant, Unit Rate EPC Phase, Client: KOCH - Feb 2014 to Present,
Title: Lead Scheduler (Software Primavera P6 V8.2, WMS)
ü
Leaded
schedule review meetings with all participants
ü
Developed
engineering procurement and construction schedule by reviewing the contract
scope of work and documents such as PDFs, P&IDs, plot plan, layout,
construction constructability & execution plan, ISO drawing,
equipment list, cable schedule, one line diagram, instrument index foundation
drawing, excavation drawing, RAS, ROS, eng. WBS, bases of estimate and SOW)
to
ü
Developed
detail resource loaded EPC schedule level 2 &3 with the basis of
schedule
ü
Prepared
schedule in line with risk department standard and attend at risk analysis
ü
Prepared
curve and man-hour histogram for engineering and construction
ü
Attended
weekly progress meeting in order to gather the data
ü
Reviewed
and updated the schedule
ü
Analyzed
Critical path, float paths and identified driver activities bi-weekly
ü
Prepared
delay analysis report
KBR, HOUSTON TX,
Lead Scheduler, Dec 212 to Feb 2014 (14 Months)
Project: KITIMAT Liquefied
natural gas (LNG Project), Client: Chevron/ Apache - FEED Phase and EPC
Proposal, Dec 212 - Feb 2014, Title: Lead Scheduler (Software Primavera P6
V7, WMS)
ü
Involved
in developing FEED Schedule level 3 with resource loaded and S-Curve
ü
Involved
in developing EPC schedule for level 2 to support class 3 estimate
ü
Developed
detail construction early Works Schedule Level III
ü
Gathered
data from engineering discipline lead and construction team
ü
Updated
detail FEED schedule Level 3 (bi-Weekly)
ü
Attended
construction weekly progress meeting and gathered data
ü
Updated
construction early works schedule level 3 (bi-Weekly)
ü
Calculated
Actual Progress and Earned Valve Indexes CPI, SPI, CV, SV, EAC, ETC
KDI, Iran,
Scheduling Manager and Project Control Lead, April 2011 to Sep 2012 (16
Months)
Project: Well head
facilities and 430 Km Pipe Line- EPC-$200 million, (Scheduling, Cost, Risk, DCC)
ü
Team
development, assigned work to team, conflict management, coordinated team
work
ü
Developed
schedule with resources loaded (Level 1,2,3 for EPC and 4, 5 for
construction)
ü
Prepared
invoices, Cash Flow and Cash Call Report
ü
Analyzed
project budgets, cost forecasts and prepare variance and productivity Report
ü
Prepared
annual project budget according to Company capital budget guidelines
ü
Provided
delay analysis and forensic scheduling techniques to identify each party
share
ü
Construction
site visit and also visit of vendor shop in order to review progress
ü
Admin
for setting up P6 including EPS, OBS, project profile, define users access
and roles, global code, backup, calendar, define recourses, reports, global
change, Import, export
ü
Prepared
planning procedure and develop progress measurement System
ü
Calculated
actual progress and Earned valve indexes CPI, SPI, CV, SV, EAC, ETC
ü
prepared
recovery plan to compensate the delay
ü
Analyzed
Delay of subcontractors to identify Client and Contractor and third party
share
ü
Provided
S-Curve, Cash Flow, Manpower and Machinery Histogram
ü
Coordinated
Work among Departments
ü
Prepare
Work Progress Appraisal (WPA) and issue invoices
ü
Issued
project deviation request/ notice (PDN)
ü
prepare
the Extension of time (EOT) and additional work orders (AWO)
OIEC/ Aira, Iran, Project Control Manager (Scheduling, Cost, Risk, DCC), Nov 2008 to March 2011 (70 months)
Project: Utility of Hormuz
Oil Refinery - EPC- $5 Billion Title: Scheduling Manager and
Project Control Manager - Nov 2008 - March 2011 (30 months)
Project: Persian Gulf Star Natural Gas to gasoline Refinery - $
3 Billion - FEED Title: Lead Scheduler - February 2008 -
October 2008 (8 months)
Project: Natural Gas
/Condensate Refinery - Phases 9&10 - $2.7 Billion
Lump Sum EPC Title: Scheduling Manager -
May 2005 - Jan 2008 (32 months) (for 13 months involved in
engineering and construction as Senior Scheduler and then for 20
months in procurement and expediting as Program Scheduling Manager)
ü
Team
development, assigned work to team, conflict management, coordinated team
work
ü
Review
scope of work, Drawings, procedures and attend meeting to defined WBS and
activity
ü
Managed
schedule of 31 projects/Contracts in 20 months as program schedule control
manager
ü
Analyzed
and address the Delay to identify each party share for 31 contract and time
and cost impact
ü
Analyzed
the Contractors, subcontractor and vendors time schedule, progress and
reports
ü
Analyzed
project deviation request (PDN/ EOT/ AWO) for 31 contract and time and cost
impact
ü
Prepared
procedure for handling planning & scheduling of vendors
ü
Generated
a procedure for using P6 (Generic work package, WBS coding and global &
activity coding, ID, Resource type, calendar, Project Set up calculation
option).
ü
Developed
resources loaded schedules level 3 for EPC
ü
Prepared
s-curve, manpower and machinery histogram for engineering & construction
ü
Prepared
analytical report and also issued regular weekly and monthly report
ü
Prepared
planning procedure and develop progress measurement system
ü
Super-user
of p6
ü
Attended
weekly progress review meetings, discussing critical path, variances and
delays of project internally and also with client
ü
Provided
risk plan and risk management procedure
ü
Construction
site visit and also visit of vendor shop in order to review progress
ü
Developed
level 4, 5 for procurement (manufacturing schedule)
ü
Involved
in developing level 4 for pre-commissioning
ü
Involved
in EPC schedules Curve and M/H Histogram for EPC
ü
Attended
weekly progress Review meetings, discussing critical path, variances and
delays of project
ü
Provided
risk plan and risk management procedure
Sungun PMBOK Co,
Iran, Scheduler, April 2001 to April
2005 (36 Months)
Project: Sungun Copper
Program includes Residential Building - EPC - $500 million Title1: Scheduler
of engineering phase (14 months) Title2: Field Scheduler of Construction
phase (22 months)
ü
Involved in preparation of detail
schedules and s-curve for EPC
ü
Gathered
actual progress of construction (equipment, labors and material)
ü
Prepared
of daily field report, weekly, and monthly report
ü
Controlled
the sub-contractors' schedules and prepare analytic reports
ü
Updated
time schedule, compare with baseline, analysis critical path
ü
Prepared
delay analysis report
ü
Analyzed
Delay to identify Client and Contractor share
Moratab, Iran,
Scheduler, Sep 2000 to March 2001 (8 Months)
Project: Establishing a supply chain management Project
ü
Prepare
flow charts
ü
Prepare
procedure related to ISO9000 standard
ü
Prepare
vendors evaluation system
ü
Prepare
a procedure to improve quality of vendors
ü
Prepare
an schedule for system improvement
ü
Update
the schedule
Fars Nousheh, Iran, Junior Scheduler,
August 1998 to August 2000 (24 Months)
Project:
Irrigation tunnel
ü
Involved
in preparation of detail schedules and s-curve for EPC
ü
Gathered
actual progress of construction (equipment, labors and material)
ü
Prepared
of daily field report, weekly, and monthly report
ü
Updated
time schedule, analysis critical path
ü
Prepared
delay analysis report
Training
courses with certification
PMBOK, Contract type, Project Finance
methods, Commercial Negotiations, Effective Communication Skills, Engineering
Documents and Quantity Estimation, Value engineering, (EFQM), ISO 9000, P6,
P3e, P3, MSP, Access, FoxPro, Word, Excel, Constructware
Languages: English, Persian,
Turkish (Azerbaijani)